Fast, compliant, and actionable building audits delivered at fixed prices.
Planning compliant pre-demolition, pre-refurbishment, and circular economy audits which your team can action in a matter of days.
01 / FAST
Reports in 48 hours
We survey to your programme, not the other way round. On site quickly and a report back in as little as 48 hours.
02 / LOW-COST
One fixed fee
Transparent pricing with no open ended day rates.
03 / COMPLIANt
Ticks the boxes
Written to BS 8895, BREEAM Wst 01 and GLA Circular Economy Statement requirements. Planners accept them.
Four services, one promise
Independent, planning ready audits at a fixed price, turned around in days.
Identify the materials and building components which can be reused, resold or recycled prior to strip-out or refurbishment.
Catalogue a building before demolition and identify what can be reused, reclaimed or recycled
Pre-Refurbishment Audits
Pre-Demolition Audit
Material Reuse & Asset Surveys
Circular Economy Statements
A focused survey of the materials and components worth reclaiming, reselling or donating.
The planning document demonstrates how your project designs out waste and keeps materials in use.
Who is this for?
Design reuse in from the start.
See exactly what the existing building offers for reuse and recycling, so you can specify it into your design rather than discover it too late. Meet planning and BREEAM requirements with hard evidence, and keep the sustainability story credible.
Architects
Cost and programme certainty.
A fixed price and a report in days, so the audit is a known line in your budget and never the thing that slips your timeline. Clear material data to plan strip-out and demolition, and one less compliance risk to chase.
Project Managers
Cut waste costs, capture value.
Know what is in the building before you start. Accurate quantities to price the job and build your waste management plan, and a clear view of the materials worth reclaiming or reselling instead of paying to send them to landfill.
Contractors
Know what your building is worth.
Understand the value locked in your building and its assets before anything comes down, from reusable materials to reclaimed products. Meet your circular economy conditions, and make an informed call on demolition versus reuse.
Building Owners
How it works, from enquiry to planning ready report.
Tell us about the project
Building type, floor area and location. We come back with a fixed quote.We audit
We come to visit the site and document the required assets to be catalogued.You get the report
Materials, quantities, reuse pathways, embodied carbon and BREEAM evidence, whichever your project requires.
Some of our previous projects
Broadway House
Pre-Demolition Audit | Commercial
3,710 tons of material catalogued across 3,000m² of office space
292 tonnes designated for reuse
Residential Home
Pre-Demolition Audit | Residential
220m² of floor area surveyed in hours
82 tonnes of material identified for reuse
Retail unit
Asset Survey | Commercial
91% of identified assets were successfully reused
£4,500+ generated in material sales
The things people ask first
-
A pre-demolition audit is a survey of a building carried out before it is demolished, to catalogue its materials and identify what can be reused, reclaimed or recycled rather than sent to landfill. It produces an inventory of quantities, conditions and recommended routes, and is used to support planning and BREEAM requirements.
-
Increasingly, yes. A growing number of local authorities ask for a pre-demolition or pre-redevelopment audit, or a Circular Economy Statement based on one, as part of planning for demolition or major redevelopment. Requirements vary by authority, so it is worth checking early, and we can tell you what your local authority expects.
-
Our audits are fixed price, so you know the cost up front rather than facing an open ended day rate. Price depends mainly on the building's floor area and type. Get in touch and we will confirm a firm quote.
Got a building coming down?
Send us the basics. You’ll have a fixed-fee quote and a realistic date within 24 hours.