Frequently Asked Questions
-
A pre-demolition audit is a survey of a building carried out before it is demolished, to catalogue its materials and identify what can be reused, reclaimed or recycled rather than sent to landfill. It produces an inventory of quantities, conditions and recommended routes, and is used to support planning and BREEAM requirements.
-
A pre-demolition audit covers a building being fully or largely demolished, while a pre-refurbishment audit covers refurbishment, strip out or partial works where much of the building stays. If you are not sure which your project needs, tell us the scope and we will advise.
-
A Circular Economy Statement is a planning document showing how a development reduces waste and keeps materials in use across its lifecycle. Some local authorities now require one for larger schemes, and it is usually built on the data from a pre-demolition or pre-refurbishment audit
-
It is a focused survey of the specific materials, fixtures and components in a building that are worth reclaiming, reselling or donating, along with their condition, quantities and possible routes to reuse. It is for clients who want to capture value from what is removed, not just meet a compliance requirement.
-
Embodied carbon is the carbon emitted in producing, transporting and installing building materials, separate from the energy a building uses once occupied. Reusing existing materials avoids the embodied carbon of new ones, which is why audits increasingly report it and why planners and BREEAM assessors care about it.
The basics
Do I need one?
-
Increasingly, yes. A growing number of local authorities ask for a pre-demolition or pre-redevelopment audit, or a Circular Economy Statement based on one, as part of planning for demolition or major redevelopment. Requirements vary by authority, so it is worth checking early, and we can tell you what your local authority expects.
-
Yes. A pre-demolition audit is needed to claim the BREEAM Wst 01 credits, up to four, by demonstrating material recovery and diversion from landfill, and it informs your Site Waste Management Plan.
Costs and timings
-
Our audits are fixed price, so you know the cost up front rather than facing an open ended day rate. The price depends mainly on the building's floor area and type. Fill in our quote form or get in touch and we will confirm a firm quote within one working day.
-
Days, not weeks. We can typically be on site quickly and return a planning ready report in as little as five working days, so the audit does not hold up your planning or programme
-
We focus on Bristol, Manchester and Leeds and the surrounding areas. However, we do also travel around the country, just let us know in your enquiry.